Bolashak BVS 1, BVS 2 and BVS 3 piping repairs

SectorOil & gasLocationPipeline between Bolashak and the LPG processing plantYear2026
Project / Overview

In January–February 2026, KMS repaired piping at operating block valve stations BVS 1, BVS 2 and BVS 3 on the pipeline connecting the Bolashak oil and gas treatment plant to the plant processing, transferring and fractionating LPG from Kashagan. The work involved Inconel 625 piping in 1-inch and ½-inch sizes.